Preparing the UUT for Test

Before testing the signal generator:

  1. Connect a GPIB cable from the computer to the signal generator.

  2. Turn on power and wait for signal generator's start up screen to display.

  3. Press Preset on the signal generator to clear any previous data.
     

Warm-up Time

Allow sufficient warm-up time for the test equipment and the signal generator. All test equipment requires a 30 minute warm-up period to ensure accurate performance.
 

Related Topic

Getting Started