Open Loop Power Calibration (Adjustment)

(N5166B / N5171B / N5172B / N5181B / N5182B / N5182N)

The ALC Calibration must be performed prior to this adjustment.

This test calibrates the accuracy of the instrument when the ALC is off.

No additional equipment required.

Connections and Setup Procedures

All test equipment requires a 30 minute warmup period to ensure accurate performance.

Initialize Test Equipment