The Extended Frequency Reconfiguration Performance Test prompts the user to reconfigure the front panel cables on the M9365A downconverter. This test runs a Reconfiguration Alignment, Comprehensive Alignment, and Self Test. When running any alignments or Self Test, the cable between the Aux2In and the Aux1Out needs to be connected.
|
Test Equipment |
Recommended Models |
|
Frequency reference module |
M9300A |
|
SMA cable, 2.4 mm (m) to 3.5 mm (m) |
M9393-20003 |