Store Cal Info to Module Performance Test

This test is performed as the final performance verification test because its purpose is to store the calibration date into the module. To find the calibration date, go to the soft front panel menu Help > About Network Analyzer.

The Receiver Calibration Verification (Functional) Test is performed after this test. It is a functional test and does not affect the calibration data stored to the VNA module.

To successfully complete the module calibration, all performance tests must be run and passed within 14 days to run this test. Note that this excludes any functional tests such at the Receiver Calibration Verification (Functional) Test.

Required Test Equipment

No additional equipment required.