This test is performed as the final performance verification test because its purpose is to store the calibration date into the module. To find the calibration date, go to the soft front panel menu Help > About Network Analyzer. This test does not apply to the M9378A/B directional coupler modules.
To successfully complete the module calibration, all performance tests must be run and passed within 14 days to run this test.
No additional equipment required.