Downconverter Path Delay Adjustment

(M9393A)

The goal of this adjustment is to determine the absolute delay of a given hardware path of the instrument. This adjustment must be run within ten minutes of the Downconverter Clock Slip adjustment.

Required Test Equipment

Test Equipment

Recommended Models1

50 W terminator

909D

Frequency reference module

M9300A

  1. Refer to the main required equipment list for alternative models.

Connections and Setup Procedures