|
|
The following adjustments are temperature sensitive and should be run together within the shortest timeframe possible to avoid affecting the absolute amplitude accuracy of the DUT: |
The goal of this adjustment is to create the path setup information for the Super Cal RF Attenuation Normalization adjustment.
|
Test Equipment |
Recommended Models1 |
|
50 W terminator |
909D |
|
Frequency reference module |
M9300A |
|
|