This section describes the available DUT signal generator performance tests. These performance tests verify that the signal generator meets specifications.
Perform the tests listed below at least once every 24 months.
|
In all test equipment configurations, cables and adapters must be properly torqued. Exceeding recommended torque values can cause damage to a cable or adapter, and may cause inaccurate test results. |
|
The N5182BX07 requires the Extender Power Alignment procedure to be performed prior to running Performance Verification test plans. Refer to the N5182BX07 User's Guide for instructions on running the Extender Power Alignment. To access the User's Guide, go to Keysight support. |
N5161A |
N5162A |
N5171B |
N5172B |
N5182BX07 |
N5166B |
Performance tests are listed in the order they should be performed to prevent invalid results and minimize changes in test equipment configurations. See individual test pages for specific model and option combinations. Click on the links below to go to the test topic page. |
x |
x |
x |
x |
x |
||
|
x |
|
x |
x |
||
x |
x |
x |
x |
x |
x |
|
x |
x |
x |
x |
|
x |
|
x |
x |
x |
x |
x |
||
x |
x |
x |
x |
x |
||
x |
x |
x |
x |
x |
x |
|
|
x |
|
|
|
|
|
|
|
|
x |
x |
||
|
|
x |
x |
x |
||
|
|
x |
x |
x |
||
|
|
x |
x |
x |
||
x |
x |
x |
x |
x |
||
|
|
x |
x |
|||
|
|
x |
x |
|||
|
|
x |
x |
|||
|
|
x |
x |
|||
|
x |
|
x |
|||
x |
x |
x |
x |
x |
||
|
|
x |
x |
x |
||
x |
x |
x |
x |
|||
x |
x |
x |
x |
|||
x |
x |
x |
x |
x |
||
x |
x |
x |
x |
x |
||
x |
x |
x |
x |
x |
||
|
|
81B |
82B |
Single-Sideband Phase Noise (N5181B / N5182B / N5182N only) |
||
|
|
|
|
|
|